Receiving and inspecting panels

Check what arrived against the confirmed order before installation.

Receive by order line

Product and application

Use the order confirmation to check item identity, quantities, dimensions and finish. Keep the packing list and delivery paperwork. Inspect accessible material for obvious damage while following safe receiving procedures and the carrier’s process.

Product options

Photograph and report discrepancies through the supplier’s approved channel within the applicable terms. Do not assume signing a delivery document resolves concealed damage or preserves every claim; ask about the actual procedures before shipment.

Order details

Set aside items needing review and avoid modifying them until the supplier gives direction. This guide does not establish legal claim deadlines or acceptance terms. Those must come from the actual agreement and carrier documentation.

Store panels before installation: product scope

Storage instructions depend on panel geometry, finish and packaging. Request the manufacturer’s guidance on support locations, stacking limits and moisture management. Do not invent a stack height from bundle appearance.

Store panels before installation: specification review

Choose a location that allows controlled handling and inspection. Secure material as appropriate under the responsible site supervisor’s plan, keeping access routes clear. Avoid unstable piles or improvised supports.

Store panels before installation: order requirements

Check coating condition and packaging during storage, and ask how trapped moisture or abrasion should be addressed. A product stored outside is not automatically suitable for every exposure simply because it will eventually become a fence.

Receiving log to keep with the packing list

LineCheckRecord
PanelsModel, count, dimensions and finishMatches / discrepancy / not yet checked
GatesLeaf / frame identification and countMatches / discrepancy / not yet checked
HardwarePart reference, bag count and quantitiesIncluded / missing / unidentified
Visible conditionBending, coating damage or suspect weldsPhoto reference and supplier direction
DispositionSupplier review and applicable reporting processDate, contact and instructions